Case Studies.

Add Case Study

Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Download Excel
Filters
  • (1)
    • (1)
  • (1)
    • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (4)
Selected Filters
4 case studies
Sort by:
Refrigeration Plant in Climatic Wind Tunnel - Johnson Controls Industrial IoT Case Study
Refrigeration Plant in Climatic Wind Tunnel
Johnson Controls has advised Jaguar Land Rover on matters relating to the service, maintenance and repair of the Heating, Ventilation, Air Conditioning & Refrigeration (HVAC&R) systems installed at the Gaydon Centre for almost 20 years. In 2012 we were invited to submit a proposal for replacement of the evaporator installed in the Climatic Wind Tunnel. In a ‘Site Survey Report’ submitted to Jaguar Land Rover, we drew their attention to the key factors that we believed were behind the evaporator’s less then optimum level of performance. The bulk of these stemmed from the fact that the existing evaporator was over 20 years old and throughout its working life a number of design changes had been made to the overall system that it formed a part of, thus rendering it no longer fit for purpose. Examples of such key factors included: • The old evaporator’s level of performance was now too ‘industrial’. It was capable of operating within a temperature range of -40°C and +55°C, while projected requirements were for a temperature range of between -10°C and +50°C. • Our concerns were raised over the suitability of the existing heat transfer fluid being used, which was proving to be highly corrosive. • The old evaporator was still operating on the soon to be banned R22 refrigerant. The use of all HCFCs for the service and maintenance of HVAC&R systems will become a criminal offence from 1st January 2015.
Download PDF
Wireless System Helps Transform Patient Care - Johnson Controls Industrial IoT Case Study
Wireless System Helps Transform Patient Care
Baptist Memorial Health Care wanted to install an in-building wireless distribution system which provides complete, reliable wireless coverage throughout facilities, enabling the use of wireless medical devices that enhance the patient experience and patient care.
Download PDF
Chilled Water System Brings Quick ROI - Johnson Controls Industrial IoT Case Study
Chilled Water System Brings Quick ROI
To increase production and meet growing demand, Newpark Mats & Integrated Services (NMIS) needed a faster and more consistent source of chilled water. Without the internal resources to design or install a chilled water system to support a custom process, NMIS turned to Johnson Controls under tight schedule for a turnkey solution.
Download PDF
Business Continuity and Energy Savings of Primary Data Centre - Johnson Controls Industrial IoT Case Study
Business Continuity and Energy Savings of Primary Data Centre
Ericsson required a new chiller solution to replace the three outdated Trane chillers that supplied the data centre’s cooling. For the new retrofit, the company needed a solution with tangible results, high reliability, as well as a centralized support and no downtime during the project.
Download PDF

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that IoT ONE may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from IoT ONE.
Submit

Thank you for your message!
We will contact you soon.